Port Facilities and Ocean Transport
The port facility at Steensby Inlet is designed to accommodate
cape-sized ore carriers for 12 months each year. Shipment of ore
from Steensby Inlet primarily to the European market, together with
all port assistance vessels, is assumed to be a service provided by
major international shipping company(s), coordinated by Baffinland’s
valued shipping partner, Fednav Limited (“Fednav”). The port
facility will consist of one ore carrier berth and one service
berth. The service berth will be used to harbour tugs and for the
delivery of project supplies. Facilities will be provided for
re-fueling of tugs.
 |
A comprehensive review of ice conditions and the
results of site specific bathymetry studies have been used to
establish appropriate shipping lanes, and to recommend the required
“ice class” for the dedicated ore carriers. Fednav has designed a
cape-size ore carrier, Polar Class 4, of 135,000 dead weight tonnes
(dwt) capacity, suitable for dedicated operations between Steensby
Port and Europe over a 12-month operating period each year. A fleet
of eight vessels will be required to fully service the project
requirements, according to the results of detailed ice transit
simulation studies.
|